Digging

 4.May 2009

At the end of last season the waterlevel got so shallow at the starting area that we crashed 3 props. Also to trailer the boot in and out was a pain in the ass.

But this year no more suffering. A digger with 24 tons and long arm came and transformed the start from 0,5m to 1,5-2 meter deepness.

Dont get a heart attack, we had to put all the sand, stones and mud first out on the shore, so that the water can drain off bevor we load it on a truck. Than we will start with rebuilding the area.
 
 
I found a new meditation place on the shovel :-)
 


I let you know as soon everything we a ready for riding.



 

 

Language

Search

Betriebszeiten

nach telefonischer


Vereinbarung je
nach Dienst bei

Fetzy
0650 90 60 99 6

oder

Mini
0650 86 15 866

bis Fr. 3.Sept
geschlossen

WakeParks

Activities